MetroWest Corridor
| MetroWest Corridor | |
|---|---|
| Overview | |
| Type | Light rail |
| System | St. Louis MetroLink |
| Locale | Greater St. Louis |
| Operation | |
| Operator(s) | Bi-State Development Agency |
| Technical | |
| Line length | 10–12-mile (16–19 km) |
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
The MetroWest Corridor is a proposed light rail alignment for the St. Louis MetroLink light rail system in St. Louis, Missouri, USA.
Proposed route
This alignment is a Phase II of the Daniel Boone Corridor that will continue from Westport Plaza in Maryland Heights to the Spirit of St. Louis Airport in Chesterfield.
External links
|
|||||||||||||||||||||||||||||
| This article related to Bi-State Development Agency is a stub. You can help Wikipedia by expanding it. |
| This rapid transit-related article is a stub. You can help Wikipedia by expanding it. |
