File:United States Air Force Academy Cadet Chapel renovation September 11, 2022.jpg

Original file(3,024 × 3,244 pixels, file size: 925 KB, MIME type: image/jpeg)

Summary

Description
English: US Air Force Academy Cadet Chapel renovation and restoration project September 11, 2022. An enormous temporary "hangar" was built over the existing structure to allow workers to remove the aluminum panels and stained glass blocks and install the originally-designed rain gutters. Photo taken in the morning with fog.
Date
Source Own work
Author CSvBibra

Licensing

I, the copyright holder of this work, hereby publish it under the following license:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

Captions

US Air Force Academy Cadet Chapel renovation and restoration project needed to address water damage September 11, 2022

Items portrayed in this file

depicts

No value exists for this property

11 September 2022

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current16:09, 12 September 2022Thumbnail for version as of 16:09, 12 September 20223,024 × 3,244 (925 KB)CSvBibraUploaded own work with UploadWizard
The following pages on the English Wikipedia use this file (pages on other projects are not listed):

Metadata