Clyde Fastlink is a high frequency bus rapid transit system in Glasgow, Scotland. The system was designed to provide greater connectivity and faster journey times between Glasgow City Centre and the Queen Elizabeth University Hospital in Govan, as well as to several other key developments along the north and south banks of the Clyde Waterfront.[1]

The project's initial conception and construction was led by Strathclyde Partnership for Transport (SPT) and Glasgow City Council.[2][3] Operation of the system is contracted by the transport authority to Stagecoach West Scotland as an extension to their existing X19 service.[4] McGill's also run their 23 and 26 services along sections of the right-of-way.[5] The 4 mile (6km) long route began construction in September 2013,[6] and was opened to passenger service in 2015 after over £40m of investment.

Route edit

Fastlink
 
Glasgow Queen Street  
 
West George Street
 
Central Station  
 
York Street
 
Cheapside Street/North Street
 
Finnieston Street
 
Pacific Quay
 
Festival Park
 
Merryland Street
 
Stag Street
 
Napier Street
 
Govan Interchange    
 
Golspie Street
 
Govan Road
 
Elder Park
 
Clachan Drive
 
Burghead Place
 
QEUH

The system runs along segregated and regular bus lanes running parallel to main roads, as well as mixed traffic sections, and uses priority signalling to allow buses in the system to move faster than regular traffic.[7] The current 'North Bank' right-of-way originates in the City Centre, integrating with the two major rail hubs, Glasgow Queen Street and Glasgow Central. The route then follows the River Clyde in a westerly direction along the Broomielaw and over the Clyde Arc bridge, where it travels west on Govan Road's segregated infrastructure past the BBC offices at Pacific Quay. It continues towards the Govan Interchange and bypasses the heart of Govan along the segregated section at Golspie Street, before making its way towards the QEUH via Govan road.

The route was chosen in order to better-connect major transport hubs in the city centre to the new Queen Elizabeth Hospital, serve the burgeoning Clyde corridor on both sides of the river, and to better connect the underserved communities of Govan and Linthouse.[4]

History edit

The Fastlink scheme was initially proposed in 2007 as a way to improve Glasgow's public transport connections in preparation for the 2014 Commonwealth Games. The first phase of the original scheme, running from Glasgow Central Station to Glasgow Harbour, was given planning approval by Glasgow City Council in July 2006. It was intended to be an interim measure before the introduction of light rail sometime after 2010.[2][8] The scheme was originally expected to be completed in 2010 and to cost £42 million.[3]

Initially, a "North-bank" and "South-bank" route were proposed, with the North Bank route running from the city centre to Ferry Road in Yoker.[7] However, Glasgow City Council's request for funding from the Scottish Government was rejected as part of the government's Strategic Transport Projects Review, citing its lack of regional impact, its failure to tackle congestion around Glasgow Central station and its lack of clear impact on emissions reductions.[9] Instead, the Government promised to investigate the construction of a wider light rail network across Glasgow, and new city centre stations to resolve city-centre connectivity issues.[10]

Impact and Criticisms edit

Despite being slated to open in time for the 2014 Commonwealth Games in Glasgow, Fastlink did not see passenger service until a year later. Additionally, the project fell significantly short of the initial proposal, which had called for a "tram on wheels" type vehicle to be used with off-board ticketing, similar to those on Belfast's Glider system and said to be capable of providing service levels of up to 12 buses per hour at peak times.[1][11][12] Operation of these vehicles likely would have been under a franchising agreement, which would have meant the control of operations remained under with SPT and Glasgow City Council.

These features were not part of the system upon its opening in 2015. Privately owned bus companies McGill's and Stagecoach now compete for passengers along the route, using regular low-floor buses which must at minimum comply with Euro 6 emission standards. There is no off-board ticketing at Fastlink stops, hence passengers cannot transfer between different operators on the route on a single fare. Service levels on the system go up to every 12 minutes at peak times.[13]

In October 2015, several news outlets reported that bus operators on the Fastlink route had advised drivers to avoid using the lanes, as they were slower than driving in regular traffic due to faulty programming in traffic signals along the route.[14][15] Operators McGill's and Stagecoach criticised Glasgow City Council for the running of the scheme due to this, and McGill's announced the cancellation of its dedicated F1 Service, however stated that this was due to service overcrowding on the corridor rather than priority signalling issues.

The removal of this service means that no operators now serve the entire originally proposed route for Fastlink, which ran in a city centre loop past Buchanan bus station, before heading south towards the Broomielaw.[16] In addition, McGill's remaining 26 and 23 services use only limited parts of the bus priority lanes.

SPT claim in their evaluation of the scheme that journey times on the Fastlink corridor have quickened by up to 20% as a result of bus priority measures,[16] and that the scheme provided greater access to healthcare at the Queen Elizabeth University Hospital.

The route was built with a future conversion to light rail in mind, and could potentially be used in future as part of the Clyde Metro project, a proposed system of light rail, heavy metro and/or bus rapid transit for Glasgow. The preliminary routes suggest a corridor running from Glasgow Airport to the City Centre via the QEUH.[17]

See also edit

References edit

  1. ^ a b "Fastlink". Clyde Waterfront. Retrieved 4 June 2023.
  2. ^ a b Craig Roberton (2005). "Clyde Fastlink... connecting Glasgow" (PDF). Glasgow City Council. Retrieved 12 November 2007.
  3. ^ a b "Clyde Fastlink". Clyde Waterfront. Retrieved 12 November 2007.
  4. ^ a b "Fastlink Scheme Evaluation" (PDF). Strathclyde Partnership for Transport. 4 May 2021.
  5. ^ Brenan, Victoria (2 October 2015). "Buses not using the fast lanes - because they're too slow". The Herald Scotland.
  6. ^ "Item 6 - The Provision of 3no Fastlink Core Routes". Glasgow City Council. 29 August 2013. Retrieved 7 August 2023.
  7. ^ a b "DG/TRANS 4 - CLYDE FASTLINK - DEVELOPER CONTRIBUTIONS". Glasgow City Council. p. 2.
  8. ^ "Clyde Fastlink". Glasgow Harbour. Archived from the original on 27 September 2007. Retrieved 12 November 2007.
  9. ^ "Strategic Transport Projects Review Report 3: Generation, Sifting and Appraisal of Interventions, Annex 3, section E5: New Busway between Glasgow City Centre, Clydebank and Glasgow Airport" (PDF). Scottish Government. 9 December 2008. Archived from the original (PDF) on 28 September 2011. Retrieved 2 January 2010.
  10. ^ "YouTube: "S3O 6798 Southern General Hospital Clyde Fastlink", Scottish Parliamentary answer by Stewart Stevenson MSP". Scottish Parliamentary Corporate Body. 8 May 2008. Archived from the original on 12 December 2021. Retrieved 2 January 2010.
  11. ^ "Fastlink services to run every five minutes". SPT Corporate. 16 March 2013. Archived from the original on 8 April 2015. Retrieved 7 August 2023.
  12. ^ "Ministers approve £40m for Glasgow Fastlink bus scheme". BBC News. 5 October 2011. Retrieved 7 August 2023.
  13. ^ "X19 - New South Glasgow Hospitals - Easterhouse". bustimes.org. Retrieved 7 August 2023.
  14. ^ "Bus firms ditch 'too slow' £40m fast lanes in Glasgow". BBC News. 2 October 2015. Retrieved 7 August 2023.
  15. ^ "Buses not using the fast lanes - because they're too slow". HeraldScotland. 2 October 2015. Retrieved 7 August 2023.
  16. ^ a b "Item 6 - Fastlink scheme evaluation" (PDF). SPT. 21 May 2021. p. 5. Retrieved 7 August 2023.
  17. ^ "Council-Led Team Continues to Support Clyde Metro". Glasgow City Council. 7 March 2023. Retrieved 7 August 2023.

External links edit