Beijing–Harbin high-speed railway

The Beijing–Harbin high-speed railway (simplified Chinese: 京哈客运专线; traditional Chinese: 京哈客運專線; pinyin: Jīng-Hā Kèyùn Zhuān Xiàn) is an operational high-speed railway corridor, announced in 2008 as part of the "Four Verticals and Four Horizontals" master railway network plan. It is part of the CRH's system of passenger dedicated lines, connecting Beijing Chaoyang railway station in Beijing and Harbin railway station in Harbin.

Beijing–Harbin high-speed railway
China Railway High-speed
A CR400BF-GZ of China Railway Harbin Group operating on Beijing-Harbin HSR as G951 from Beijing Chaoyang to Harbin West on 22 January 2024, the 3rd anniversary date of this line
Overview
Native name京哈高速铁路
京哈高速线
Owner
Locale
Termini
Stations37
Service
TypeHigh-speed rail
Operator(s)China Railway High-speed China Railway High-speed
Depot(s)Beijing, Shenyang, Changchun, Dalian, Harbin
Rolling stockTBD: CRH380B series
History
OpenedJanuary 22, 2021 (2021-01-22)
Technical
Line length1,700 km (1,100 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC (Overhead line)
Operating speed350 km/h (220 mph)
Route map

km
0
Beijing
12
Beijing Chaoyang
Railway Test Center, Beijing Chaoyang freight yard
Right arrow Northeast Ring to Shahe
34
Shunyi West
62
Huairou South
78
Miyun
116
Xinglongxian West
160
Anjiang
186
Chengde South
215
Chengdexian North
252
Pingquan North
313
Niuheliang
348
Kazuo
378
Nailingao
415
Liaoning Chaoyang
Jinzhou North, Batuying,
Linghai South
452
Beipiao
Panjin North
500
Ulanmod
Panjin
533
Fuxin;
Haicheng West
589
Heishan North
Tai'an
Liaozhong
631
Xinmin North
Anshan West
669
Shenyang West
Liaoyang
Dīngxiang Hu line
Shenyang
691
Shenyang North (high-speed field)
Tianyitun (high-speed field)
Liuwangtun crossover
745
Tieling West
792
Kaiyuan West
820
Changtu West
871
Siping East
926
Gongzhuling East
989
Changchun West
Changchun
1083
Dehui West
1141
Fuyu North
1199
Shuangcheng North
1239
Harbin West
Harbin Guxiangchang
1246
Harbin
km
CRH380AM performing a test run on the Beijing–Chengde section in Beinianfeng Village, Yangsong Town, Huairou District, Beijing in October 2020
A CR400BF-GZ departing from Beijing Chaoyang railway station in snow as G901 to Harbin West in February 2022

The line is part of the Harbin–Hong Kong (Macau) corridor, and is 1,700 km (1,100 mi) long. The distance between Beijing and Harbin in 1,198 km (744 mi) after opening of this section in Jan 2022.[1] It comprises the sections: Harbin–Dalian high-speed railway, the Beijing–Shenyang high-speed railway, and the Panjin–Yingkou high-speed railway.

Components edit

The main route of the Beijing–Harbin high-speed railway begins as the Beijing–Shenyang high-speed railway to the city of Shenyang. At Shenyang, the main route continues as part of the Harbin–Dalian high-speed railway, which travels from Harbin to Dalian via Shenyang. The remaining section of the Harbin–Dalian high-speed railway between Shenyang and Dalian serves as a branch route to Dalian as well as Yingkou, which is one of the termini of the Panjin–Yingkou high-speed railway. Here the Panjin–Yingkou high-speed railway is a short branch to the city of Panjin. At Panjin, the railway connects to the Qinhuangdao–Shenyang high-speed railway, which is part of the Beijing–Harbin Railway.[2]

Section Description Designed
speed
(km/h)
Length
(km)
Construction
start date
Open date
Beijing–Harbin
high-speed railway
 
HSR Corridor of Northeast China, consisting of the Beijing-Shenyang & Harbin-Dalian and the Panjin-Yingkou spur. 350 1700 2007-08-23 2021-01-22[3]
Beijing–Shenyang section
(Beijing–Shenyang high-speed railway)
 
HSR from Beijing to Shenyang via Chengde, Fuxin and Chaoyang 350 700 March 2014[4] 2018-12-29 (Chengde South–Shenyang section)
2021-01-22[3] (Beijing Chaoyang–Chengde South section)
Harbin–Dalian section
(Harbin–Dalian high-speed railway)
 
HSR from Harbin to Dalian via Shenyang & Changchun 350 904 2007-08-23 2012-12-01[5]
Panjin–Yingkou section
(Panjin–Yingkou high-speed railway)
Connects Yingkou on Harbin–Dalian HSR with Panjin on Qinhuangdao-Shenyang HSR 350 89 2009-05-31 2013-09-12[6]

Station list edit

Harbin–Dalian section edit

Station Chinese Distance
(km)
Prefecture-level
city
Province Metro transfers
Harbin 哈尔滨 Harbin Heilongjiang
Harbin West 哈尔滨西    3 
Shuangcheng North 双城北
Fuyu North 扶余北 Songyuan Jilin
Dehui West 德惠西 Changchun
Changchun 长春  1   3   4 
Changchun West 长春西  2 
Gongzhuling South 公主岭南 Siping
Siping East 四平东
Changtu West 昌图西 Tieling
Kaiyuan West 开原西
Tieling West 铁岭西
Shenyang North 沈阳北 Shenyang Liaoning  metro   2 
Shenyang 沈阳  metro   1 
Liaoyang 辽阳 Liaoyang
Anshan West 鞍山西 Anshan
Haicheng West 海城西
Yingkou East 营口东 Yingkou
Gaizhou West 盖州西
Bayuquan 鲅鱼圈
Wafangdian West 瓦房店西 Dalian
Jinpu 金普
Dalian North 大连北  METRO   1 
Dalian 大连  METRO   3 

Beijing–Shenyang section edit

Station Chinese Distance
(km)
Prefecture-level
city
Province/
Municipality
Metro transfers
Beijing[a] 北京 N/A Beijing    2 
Beijing Chaoyang 北京朝阳    3  (Under construction)
Shunyi West 顺义西
Huairou South 怀柔南
Miyun 密云
Xinglongxian West 兴隆县西 Chengde Hebei
Anjiang 安匠
Chengde South 承德南
Chengdexian North 承德县北
Pingquan North 平泉北
Niuheliang 牛河梁 Chaoyang Liaoning
Kazuo 喀左
Nailingao 奈林皋
Liaoning Chaoyang 辽宁朝阳
Beipiao 北票
Wulanmutu 乌兰木图 Fuxin
Fuxin 阜新
Heishan North 黑山北 Jinzhou
Xinmin North 新民北 Shenyang
Shenyang West 沈阳西
Shenyang 沈阳  metro   1 
  1. ^ Since June 25, 2021.[7]

References edit

  1. ^ Beijing-Harbin High-Speed Railway Opens to Traffic, retrieved 2022-04-11
  2. ^ "盘营铁路客运专线东连即将开工的京沈客运专线_铁路新闻_中华铁道网" (in Chinese). Archived from the original on 2012-03-21. Retrieved 2011-07-03.
  3. ^ a b "京沈高铁1月22日全线开通". 2021-01-21. Archived from the original on 2021-01-29. Retrieved 2021-01-21.
  4. ^ 北京至沈阳铁路客运专线开建. 高铁网. 2014-05-07. Retrieved 2014-05-08.
  5. ^ "World's fastest railway in frigid regions starts operation". English.news.cn. 2012-12-01. Archived from the original on December 4, 2012. Retrieved 2012-12-01.
  6. ^ 盘锦至营口高速铁路运营 大连到北京6小时. People's Daily Online. 2013-09-12. Retrieved 2013-09-18.
  7. ^ "京哈高铁首次迎来复兴号智能型动车组 列车增至34列". 2021-06-11. Retrieved 2021-06-17. 京哈高铁哈尔滨西站始发的G902次高速动车组列车将首次图定停靠北京站