Al Furjan is a property development in Jebel Ali, Dubai, United Arab Emirates.[2] Nakheel Properties heads the development and Azizi Developments owns the largest number of residential buildings.[3][4][5] It borders Jebel Ali Village and is near Ibn Battuta Mall, the Gardens, and Expo 2020.[6] Homes in Al Furjan are typically built in Al Hejaz (inspired by traditional Arabic architecture), Dubai (local architectural style), or Quortaj (Islamic/Mediterranean architecture) styles.[7][8]

Al Furjan
الفرجان
Project
Construction started2008
StatusIn progress
DeveloperNakheel Properties
Location
Al Furjan is located in Dubai
Al Furjan
Location within Dubai
Al Furjan is located in United Arab Emirates
Al Furjan
Location within United Arab Emirates
Coordinates: 25°1′30.72″N 55°8′45.24″E / 25.0252000°N 55.1459000°E / 25.0252000; 55.1459000
Country United Arab Emirates
CityDubai
DistrictJebel Ali
LocationDubai, United Arab Emirates
Area
 • Total560 ha (1,380 acres)
Population
 (2021)
 • Total26,000[1]

In addition to constructions from Nakheel and Azizi, Al Furjan also has buildings by Danube Properties, Ghreiwati Properties, Al Jaziri Brothers, Seen Real Estate Developers, Jag Development, Meilenstein Real Estate Development, CPL Real Estate Development, Invest Group Overseas, MAG Property Development, Diamond Real Estate Developers, and Wasl Properties.

History edit

The first phase of the project, focused on the East and South villages, was announced in September 2007 and its 800 villas and terrace homes sold out within a week.[9][10] Phase two focused on the North and West villages.[9] In June 2008, Nakheel Properties awarded Arabtec Holding PJSC a AED $3 billion contract, the first of the project, to build 1,400 homes.[11][12][13] Al Shafar Transport and Contracting Company won the second contract to build villas and terraced homes.[12] As of July 2021, the development is still in phase one.[9] The project was originally scheduled for completion in 2011 and was to make up 4,000 residences, a number of hotels, restaurants, and shops, and would house 90,000 people.[12] Construction was halted in 2009[14] but restarted all short-term projects by the end of the year, with Al Shafar the first contractor to resume work.[15][16] Arabtec construction halted again in January 2010 due to unpaid arrears.[13]

Mohammed Rashed has been the Director of the project since its inception.[17]

Nakheel edit

Construction on Nakheel's main Al Furjan community began in 2009, was originally anticipated to be completed in 2011[18] and was projected to cost US$1.5 billion.[18]

Al Furjan by Nakheel a villa sub-community within Al Furjan and was the first to be built. Masakin Al Furjan is a seven-block, low-rise, family-oriented community located in the South Village. Marooj Al Furjan is a residential community with 418 villas.[1] Construction began in 2021 and is slated for completion in 2024.[19] 418 homes[20] were put up for sale as off-plan properties and were completely sold out within four hours.[21]

The Al Furjan Pavilion in Al Furjan South, built by Nakeel and opened in December 2016,[22] contains a Spinneys,[6] a Medicentre clinic (GPs, pediatricians, dentists),[23] a 300-car lot, a membership recreation center, and several storefronts for restaurants and retail.[24][25]

Azizi edit

 
Azizi logo

Though Nakheel is the main developer of the community, Azizi Developments has a very large presence; as of February 2021, they have built 18 residential buildings in Al Furjan. Its Yasamine, Feriouz, Orchid, Acacia, Tulip, Aster, Liatris, Freesia, Daisy, and Iris buildings all opened in 2017.[26][27][28][29][30] The Roy-Mediterranean[31] and the Montrell,[32] both serviced apartments, were announced in 2016 and opened in 2018 and contain high-end apartments.[33][24] The Samia, which contains a mosque and nursery among its amenities, and the Ferista also opened in 2018.[34][35] The Pearl and the Plaza both opened in 2019 and the Farishta in 2020.[36] The Shaista opened in early 2021[37] and the Star, which has nearly 500 apartments and 13 retail spaces, opened in the summer of 2021.[38] The Berton began construction in 2017 and was originally scheduled to open in 2019, but is now expected to be finished by the end of 2021.[39]

Education edit

At its launch in 2007, two schools were planned for Al Furjan.[40] The Arbor School opened in 2018 as a preschool through year six institution and has been adding year groups on each year since its inception.[41][42] The Arbor School teaches from the National Curriculum for England.[42] It is considered the first eco-school in the UAE.[43] Al Furjan South has a branch of Jebel Ali Village Nursery, which caters to children ages 18 months to 4 years.[44][42] Arcadia Education announced it would open its third location in Al Furjan in August 2021 and would offer up to year eleven.[45]

Religious buildings edit

Al Furjan West has a mosque[2] located next to the Al Furjan West Pavilion.[42] Al Furjan South also has a mosque.[46][47] The community does not currently have any synagogues, temples, or churches and non-Muslim residents are encouraged to attend religious services at facilities in nearby Jebel Ali.[42]

Transport edit

The location is served by the eponymous Al Furjan metro station, part of the Dubai Metro on the Route 2020 extension to the Red Line for Expo 2020.[48][49]

References edit

  1. ^ a b "Nakheel Launches 418 New Homes At Al Furjan" (Press release). Albawaba. 2021-05-20. Retrieved 2021-07-24.
  2. ^ a b HS (n.d.). "Gated community living in Dubai: the pros and cons of Al Furjan". MyBayut. Retrieved 2021-07-24.
  3. ^ Dey, Paromita (2018-09-26). "Race to the top: Azizi Developments in Al Furjan". Construction Business News. Retrieved 2021-07-24.
  4. ^ "Al Furjan". AreaGuides. Bayut. Retrieved 26 May 2021.
  5. ^ "Ritz Residence (Ritz Tower) Al Furjan by Danube Properties". Lookup.ae – Real Estate. Real Information. Retrieved 2018-05-29.
  6. ^ a b Nasir, Sarwat (2019-09-19). "People & Places: Al Furjan is a thriving community offering value for money". Khaleej Times. Retrieved 2021-07-24.
  7. ^ "Nakheel launch new style of homes at Al Furjan". Gulf News. 2008-05-04. Retrieved 2021-07-24.
  8. ^ Zand, Shadi (2016-08-30). "Al Furjan is a hidden gem for investors".
  9. ^ a b c "Al Furjan sells out in seven days". Arabian Business. 2007-10-03. Retrieved 2021-07-24.
  10. ^ "Phase 1 Al Furjan". Provident Estate. n.d. Retrieved 2021-07-24.
  11. ^ "Arabtec collects US $816m Al Furjan". Construction Week Online. 2008-06-14. Retrieved 2021-07-24.
  12. ^ a b c Giuffrida, Angela (2008-06-30). "New deal for Al Furjan project". N Business. Retrieved 2021-07-24.
  13. ^ a b Attwood, Ed (2010-08-10). "Al Furjan restart still 'under review' – Arabtec CFO". Arabian Business. Retrieved 2021-07-24.
  14. ^ Collinson, Patrick (2009-05-26). "Dubai suffers biggest house price slump". The Guardian. Retrieved 2021-07-24.
  15. ^ Benham, Jason (2010-09-22). "UPDATE 1-Dubai's Nakheel restarts Al Furjan project". Reuters. Retrieved 2021-07-24.
  16. ^ "Nakheel revives Al Furjan development". Gulf News. 2010-09-23. Retrieved 2021-07-24.
  17. ^ "Nakheel seeks to capitalise on Dubai villa shortage". Construction Week Online. 2008-10-26. Retrieved 2021-07-24.
  18. ^ a b "Al Furjan Development | Construction Projects". Construction Week. 17 November 2008. Archived from the original on 2018-05-30. Retrieved 26 May 2021.
  19. ^ Foreman, Colin (2021-05-23). "Nakheel sells $218m of off-plan villas". MEED. Retrieved 2021-07-24.
  20. ^ "Al Furjan Villas". Al Furjan Villas. Retrieved 2023-10-26.
  21. ^ "Nakheel sells Murooj Al Furjan Phase 1 villas worth $217.8mn in record 4 hours". MEP Middle East. 2021-05-23. Retrieved 2021-07-24.
  22. ^ Dhal, Sharmila (2017-01-04). "Have you been to the new community centre at Al Furjan?". Gulf News. Retrieved 2021-07-24.
  23. ^ "Medicentres Al Furjan Pavilion is Now Open!". Medicentres. 2017-04-19. Retrieved 2021-07-24.
  24. ^ a b "Al Furjan Area Guide". Which School Advisor. n.d. Retrieved 2021-07-24.
  25. ^ McGinley, Shane (2014-01-29). "Residents fury after crime spate at Nakheel's Al Furjan development". Arabian Business. Retrieved 2021-07-24.
  26. ^ "Azizi Developments inaugurates two new projects in Al-Furjan: Azizi Berton and Azizi Pearl". Arab News. 2017-07-06. Retrieved 2021-07-24.
  27. ^ "Azizi Daisy". Propsearch.ae. 2021-07-17. Retrieved 2021-07-24.
  28. ^ "Azizi Freesia". Propsearch.ae. 2021-07-09. Retrieved 2021-07-24.
  29. ^ "Azizi Developments Completes And Delivers AED 460m Projects In Al Furjan In 20 Months". Azizi Developments. 2017-12-11. Retrieved 2021-07-24.
  30. ^ "Azizi Tulip". Prop Search. 2021-06-27. Retrieved 2021-07-24.
  31. ^ "Azizi Developments Launches The AED 350m "Roy-Mediterranean" Serviced Apartment Project". Azizi Developments. 2016-08-10. Retrieved 2021-07-24.
  32. ^ Sell, George (2016-07-29). "Azizi Developments gears up for launch of Montrell serviced apartments". Serviced Apartments News. Retrieved 2021-07-24.
  33. ^ Chapman, Sophie (2020-05-16). "Azizi Developments finishes $124mn worth of Al Furjan projects within 18 months". Construction Global. Retrieved 2021-07-24.
  34. ^ "Azizi Samia". Property Shop Investment. n.d. Retrieved 2021-07-24.
  35. ^ "Azizi Ferista by Azizi Developments in Jebel Ali Village". Housing.com. n.d. Retrieved 2021-07-24.
  36. ^ "Azizi completes work on 284-unit Farishta in Dubai's Al Furjan". Construction Week Online. 2020-02-26.
  37. ^ "Azizi Developments begins handover of Shaista in Al Furjan". Construction Week Online. 2021-03-10. Retrieved 2021-07-24.
  38. ^ "Azizi completes 98% construction of Star in Al Furjan". Construction Weekly Online. 2021-05-27. Retrieved 2021-07-24.
  39. ^ "Berton by Azizi". Prop Search. n.d. Retrieved 2021-07-24.
  40. ^ "Al Furjan project to embody". Gulf Weekly. 2007-09-11. Retrieved 2021-07-24.
  41. ^ "Fees". The Arbor School. n.d. Retrieved 2021-07-24.
  42. ^ a b c d e "Al Furjan area guide" (PDF). Ghreiwati Properties. 2019. Retrieved 2021-07-24.
  43. ^ "THE NEW ECOLOGICAL SCHOOL IN DUBAI REVOLUTIONISING THE WAY KIDS UNDERSTAND THE ENVIRONMENT". Scene Arabia. 2018-03-01. Retrieved 2021-07-24.
  44. ^ "Jebel Ali Village Nursery". The School Show. n.d. Retrieved 2021-07-24.
  45. ^ Mollon, Jenny (2020-02-26). "Affordable Arcadia School to Open in Al Furjan". Which School Advisor. Retrieved 2021-07-24.
  46. ^ Zendera, Yamurai (2016-08-30). "Nakheel seeks contractor for Al Furjan mosque". Construction Week Online. Retrieved 2021-07-24.
  47. ^ "Al Furjan South Mosque Project". Zawya. n.d. Retrieved 2021-07-24.
  48. ^ "Al Furjan Metro Station". Dubai Online. Retrieved 26 May 2021.
  49. ^ Nagraj, Aarti (2020-12-20). "Dubai Metro's Route 2020 to begin operating from January 1, 2021". Gulf Business. Retrieved 2021-07-23.

External links edit